Planned End Date:
11/2016
Completion Date:
04/2017
Status:
Completed
Management Response:
Yes
Evaluation Budget(US $):
6,000

Share

Document Type Language Size Status Downloads
Download document RAPPORT EVALUATION FINALE PADEL VERSION ANGLAISE.pdf report English 1372.45 KB Posted 228
Download document TDR MISSION EVALUATION FINALE DU PADEL-PNDL.docx tor French 39.05 KB Posted 219
Title Evaluation Finale du Programme PADEL/PNDL
Atlas Project Number: 00050327
Evaluation Plan: 2012-2018, Senegal
Evaluation Type: Project
Status: Completed
Completion Date: 04/2017
Planned End Date: 11/2016
Management Response: Yes
Focus Area:
  • 1. Others
Corporate Outcome and Output (UNDP Strategic Plan 2014-2017)
  • 1. Output 3.2. Functions, financing and capacity of sub-national level institutions enabled to deliver improved basic services and respond to priorities voiced by the public
Evaluation Budget(US $): 6,000
Source of Funding: TRAC
Evaluation Expenditure(US $): 4,000
Joint Programme: No
Joint Evaluation: No
Evaluation Team members:
Name Title Email Nationality
Abdoulaye SENE Consultant National SENEGAL
GEF Evaluation: No
Key Stakeholders:
Countries: SENEGAL
Lessons
Findings
Recommendations
1

Les MDL constituent l’un des effets phares du PADEL, mais n’ont aucun encrage institutionnel. Leur ancrage institutionnel est une nécessité impérieuse. Cet ancrage  à notre avis, devrait se faire en parfaite adéquation avec la grande Agence proposée issue de la fusion de l’ADL et du PNDL. Les MDL pourraient être les déclinaisons au niveau départemental de cette Agence. La réflexion en cours tendant à faire des MDL des établissements publics locaux doit aller jusqu’au bout en procédant à la fusion de l’ADL et du PNDL

2

The advent of Act 3 of decentralization led to full communalization and the erection of the department into a local authority. Like the federation of Technical and Financial Partners (TFP) interventions with a view to synergy in the financing of decentralization, the federation of state intervention structures in decentralization must be carried out. These are the Local Development Agency (LDA) and the National Program for Local Development. These structures must merge and constitute a large Agency for decentralization and local economic development with, if necessary, departmental variations

3

House of Local Development (HLD) is one of the flagship effects of LEDSP, but has no institutional inking. Their institutional anchorage is an imperative necessity. This anchoring, in our opinion, should be done in perfect harmony with the proposed large agency resulting from the merger of the LDA and the NPLD. The HLDs could be the variations at the departmental level of this Agency. The ongoing reflection on making LDCs in local public institutions must go all the way through the merger of the LDA and the NPLD

4

The contribution of the State in the Local Economic development fund (LEDF) must be increased and diversified. For example, the BCI and TFP (state resources) resources, a significant portion of the future oil and gas resources should be used to bail out it for the financing of local economic development. Borrowing by local authorities should also take place

5

In the light of the experience gained from the LEDSP/ NPLD, integrating a sustainability strategy from the outset of the project would ensure a prospect for future projects

6

Implementation of large-scale projects in LCs has always been preceded by an environmental impact study led by the RDA. This, in order to take account of the potential effects of the projects on the environment but also on the gender dimension. This consideration of the environmental dimension should, in future projects, integrate climate change with enormous ecosystem consequences.

1. Recommendation:

Les MDL constituent l’un des effets phares du PADEL, mais n’ont aucun encrage institutionnel. Leur ancrage institutionnel est une nécessité impérieuse. Cet ancrage  à notre avis, devrait se faire en parfaite adéquation avec la grande Agence proposée issue de la fusion de l’ADL et du PNDL. Les MDL pourraient être les déclinaisons au niveau départemental de cette Agence. La réflexion en cours tendant à faire des MDL des établissements publics locaux doit aller jusqu’au bout en procédant à la fusion de l’ADL et du PNDL

Management Response: [Added: 2017/12/30]

Nous prenons bonne note de cette recommandation et en tiendrons compte en rapport avec la partie nationale dans l'éléboration de nouveaux projets programmes d'appui relatifs au developpment local tout en en integrant la dimension territoiralisation, creation de poles de developpement, mise en oeuvre  et suivi des ODD

Key Actions:

2. Recommendation:

The advent of Act 3 of decentralization led to full communalization and the erection of the department into a local authority. Like the federation of Technical and Financial Partners (TFP) interventions with a view to synergy in the financing of decentralization, the federation of state intervention structures in decentralization must be carried out. These are the Local Development Agency (LDA) and the National Program for Local Development. These structures must merge and constitute a large Agency for decentralization and local economic development with, if necessary, departmental variations

Management Response: [Added: 2018/01/03]

Le Gouvernement est en train de réfléchir à la mise en place d’une structure technique fédératrice d’intervention des collectivités territoriales.  Notre appui futur s’inscrira de façon significative, dans des cadres de partenariats renforcés (acteurs publics au niveau national/local, secteur privé, société civile, partenaires au développement, SNU) afin de capitaliser sur les acquis des interventions des partenaires et développer des synergies pour la mise en œuvre de programmes efficaces répondant aux besoins des populations

Key Actions:

Key Action Responsible DueDate Status Comments Documents
. le renforcement des capacités nationales en vue de l’atteinte des ODD
[Added: 2018/01/03]
Directeur Pays 2018/12 Overdue-Initiated History
3. Recommendation:

House of Local Development (HLD) is one of the flagship effects of LEDSP, but has no institutional inking. Their institutional anchorage is an imperative necessity. This anchoring, in our opinion, should be done in perfect harmony with the proposed large agency resulting from the merger of the LDA and the NPLD. The HLDs could be the variations at the departmental level of this Agency. The ongoing reflection on making LDCs in local public institutions must go all the way through the merger of the LDA and the NPLD

Management Response: [Added: 2018/01/03]

L’ancrage des maisons de developpement local a pu se poursuivre grâce au partenariat établi avec les agences regionales de developpement (ARD)

Key Actions:

Key Action Responsible DueDate Status Comments Documents
Appui technique aux porteurs de projets Renforcement de capacités des acteurs
[Added: 2018/01/03]
Directeur Pays 2018/12 Overdue-Initiated
4. Recommendation:

The contribution of the State in the Local Economic development fund (LEDF) must be increased and diversified. For example, the BCI and TFP (state resources) resources, a significant portion of the future oil and gas resources should be used to bail out it for the financing of local economic development. Borrowing by local authorities should also take place

Management Response: [Added: 2018/01/03]

Le PNUD fera le plaidoyer pour l’augmentation des ressources nationales pour l’appui à des initiatives de développement

Key Actions:

Key Action Responsible DueDate Status Comments Documents
Mise en place de mécanismes d’appui aux initiatives économiques Renforcement des capacités des acteurs
[Added: 2018/01/03]
Directeur Pays 2018/12 Overdue-Initiated
5. Recommendation:

In the light of the experience gained from the LEDSP/ NPLD, integrating a sustainability strategy from the outset of the project would ensure a prospect for future projects

Management Response: [Added: 2018/01/03]

Le PNUD s’est inspiré de la stratégie durable lors de la formulation du PUDC en s’appuyant sur les structures pérennes de l’administration

Key Actions:

Key Action Responsible DueDate Status Comments Documents
Renforcement des capacités des acteurs Mise en place d’un cadre de dialogue et de concertation
[Added: 2018/01/03]
Directeur Pays 2018/12 Overdue-Initiated
6. Recommendation:

Implementation of large-scale projects in LCs has always been preceded by an environmental impact study led by the RDA. This, in order to take account of the potential effects of the projects on the environment but also on the gender dimension. This consideration of the environmental dimension should, in future projects, integrate climate change with enormous ecosystem consequences.

Management Response: [Added: 2018/01/03]

Tenant compte de cette recommandation, le Bureau a pu faire la promotion de plans climats territoriaux pour prendre en compte la dimension environnement et changement climatique

Key Actions:

Key Action Responsible DueDate Status Comments Documents
Mise en œuvre de plans climats Renforcement de capacités des acteurs
[Added: 2018/01/03]
Directeur Pays 2018/12 Overdue-Initiated