Final Evaluation of the Urban Disaster Risk Reduction Project.

Report Cover Image
Evaluation Plan:
2017-2021, Haiti
Evaluation Type:
Final Project
Planned End Date:
03/2017
Completion Date:
03/2017
Status:
Completed
Management Response:
Yes
Evaluation Budget(US $):
25,000

Share

Document Type Language Size Status Downloads
Download document HTI_Evalfinale_RRU_TDR_FR_Feb2017.pdf tor French 215.38 KB Posted 182
Download document HTI_Evalfinale_RRU_Rapport initial_FR_Fev17.pdf report French 824.89 KB Posted 183
Download document HTI_Evalfinale_RRU_Rapport final_FR_Mars17.pdf report French 2934.93 KB Posted 202
Download document HTI_Evalfinale_RRU_Rapport final_ENG_Mars17.pdf report English 1308.84 KB Posted 222
Download document HTI_Evalfinale_RRU_Presentation_MPCE_Mars17.pdf related-document French 3020.54 KB Posted 163
Title Final Evaluation of the Urban Disaster Risk Reduction Project.
Atlas Project Number: 00075836
Evaluation Plan: 2017-2021, Haiti
Evaluation Type: Final Project
Status: Completed
Completion Date: 03/2017
Planned End Date: 03/2017
Management Response: Yes
Focus Area:
  • 1. Crisis Prevention & Recovery
  • 2. Others
Corporate Outcome and Output (UNDP Strategic Plan 2014-2017)
  • 1. Output 5.1. Mechanisms in place to assess natural and man-made risks at national and sub-national levels
Evaluation Budget(US $): 25,000
Source of Funding: project budget
Joint Programme: No
Joint Evaluation: No
Evaluation Team members:
Name Title Email Nationality
Anita Shah Independent Consultant
GEF Evaluation: No
Key Stakeholders:
Countries: HAITI
Lessons
Findings
1.

Page 34

The approach enabled the discovery of numerous, major, active tectonic incidents, likely to happen again in the future and likely to produce earthquakes of a significant magnitude. Several in-depth field studies enabled the characterization of these active faults through the analysis of quaternary sediment deformations and/or morphological disturbances.

 

Pg 38

In future Haitian capacity, could be used to undertake the mapping, however at present this capacity does not exist in sufficient quality and quantity and an intermodal firm had to be contracted. In addition, strengthening and using local capacity is a long-term project. It cannot be achieved in two years.


Recommendations
1

Page 27.

In future, higher quality logical frameworks need to produced and carefully verified by donors prior to approval, as logical frameworks serve as the basis for final evaluations. Table 10 below shows the progress made in relation to the performance indicators in the DFID logical framework.

2

Page 43

In future, the risk maps could also be shared with the general public in the form of 3D models. In future projects, a communication strategy should be implemented and monored and sufficient time should be built into the project to cater for this.

3

Pg 44

The figures in the preassessment were found to be reasonably accurate. The availability of this type of data facilitates planning and permits a rapid aid response, especially when it is difficult to access the disaster affected area. In the future, DPC and humanitarian partners could make better use of these types of pre-assessments of damage and loss, where risk assessments are available.

 

1. Recommendation:

Page 27.

In future, higher quality logical frameworks need to produced and carefully verified by donors prior to approval, as logical frameworks serve as the basis for final evaluations. Table 10 below shows the progress made in relation to the performance indicators in the DFID logical framework.

Management Response: [Added: 2018/08/25] [Last Updated: 2018/12/26]

Recommendation acceptée

Key Actions:

Key Action Responsible DueDate Status Comments Documents
1.1. Les indicateurs doivent être réalistes, au cas où le bailleur nous impose des indicateurs irréalistes, des séances de concertations avec ce dernier devrait être mise en place pour ajuster les indicateurs avant la signature du contrat
[Added: 2018/12/26]
PNUD/MPCE (avec financement de l’UE) 2017/12 Completed Nous avons appliqué cette recommandation dans le cadre de tous les nouveaux projets obtenus depuis 2017 jusqu’à présent.
2. Recommendation:

Page 43

In future, the risk maps could also be shared with the general public in the form of 3D models. In future projects, a communication strategy should be implemented and monored and sufficient time should be built into the project to cater for this.

Management Response: [Added: 2018/08/25]

Key Actions:

3. Recommendation:

Pg 44

The figures in the preassessment were found to be reasonably accurate. The availability of this type of data facilitates planning and permits a rapid aid response, especially when it is difficult to access the disaster affected area. In the future, DPC and humanitarian partners could make better use of these types of pre-assessments of damage and loss, where risk assessments are available.

 

Management Response: [Added: 2018/08/25] [Last Updated: 2018/12/26]

Recommandation partiellement acceptée. En effet, les cartes ont été partagés sous forme de modèle numérique 3D couvrant la totalité du département de la Grand’Anse. Cependant, la modélisation analogique (élaboration de maquette 3D), pourra être envisageable sur des petits secteurs d’étude

Key Actions:

Key Action Responsible DueDate Status Comments Documents
3.1 Généraliser la restitution des cartes en modèle numérique 3D animés pour les cartes des risques
[Added: 2018/12/26]
PNUD/MPCE (avec financement de l’UE) 2017/12 Completed Déjà planifiés et pris en compte dans le projet cartographie multirisques en cours.