UNDP-GEF Midterm Review: South Africa Wind Energy project (SAWEP) Phase 2

Report Cover Image
Evaluation Plan:
2013-2020, South Africa
Evaluation Type:
Mid Term Project
Planned End Date:
07/2019
Completion Date:
12/2019
Status:
Completed
Management Response:
Yes
Evaluation Budget(US $):
40,000

Share

Document Type Language Size Status Downloads
Download document SAWEP Phase 2 MTR_Approved.pdf tor English 460.63 KB Posted 350
Download document South Africa Wind Energy Project - MTR Report Phase II.pdf report English 1405.95 KB Posted 1127
Title UNDP-GEF Midterm Review: South Africa Wind Energy project (SAWEP) Phase 2
Atlas Project Number: 00090545
Evaluation Plan: 2013-2020, South Africa
Evaluation Type: Mid Term Project
Status: Completed
Completion Date: 12/2019
Planned End Date: 07/2019
Management Response: Yes
UNDP Signature Solution:
  • 1. Resilience
  • 2. Energy
Corporate Outcome and Output (UNDP Strategic Plan 2018-2021)
  • 1. Output 1.5.1 Solutions adopted to achieve universal access to clean, affordable and sustainable energy
  • 2. Output 2.5.1 Solutions developed, financed and applied at scale for energy efficiency and transformation to clean energy and zero-carbon development, for poverty eradication and structural transformation
SDG Goal
  • Goal 7. Ensure access to affordable, reliable, sustainable and modern energy for all
  • Goal 9. Build resilient infrastructure, promote inclusive and sustainable industrialization and foster innovation
SDG Target
  • 7.1 By 2030, ensure universal access to affordable, reliable and modern energy services
  • 9.4 By 2030, upgrade infrastructure and retrofit industries to make them sustainable, with increased resource-use efficiency and greater adoption of clean and environmentally sound technologies and industrial processes, with all countries taking action in accordance with their respective capabilities
Evaluation Budget(US $): 40,000
Source of Funding: UNDP-GEF
Evaluation Expenditure(US $): 2,500
Joint Programme: Yes
Joint Evaluation: No
Evaluation Team members:
Name Title Email Nationality
Karen Eatwell Ms k.eatwell@primeafrica.net
GEF Evaluation: Yes
GEF Project Title: South African Wind Energy Project (SAWEP Phase 2) (PIMS 5256)
Evaluation Type: Mid-term Review
Focal Area: Biodiversity
Project Type: FSP
GEF Phase: GEF-5
GEF Project ID: 00090545
PIMS Number: 5256
Key Stakeholders: South African Energy Development Institute (SANEDI),
Countries: SOUTH AFRICA
Comments:

The MTR will assess progress towards the achievement of the project objectives and outcomes as specified in the Project Document, and assess early signs of project success or failure with the goal of identifying the necessary changes to be made in order to set the project on-track to achieve its intended results. The MTR will also review the project’s strategy, its risks to sustainability

Lessons
Findings
Recommendations
1

Extend the project by an additional 12 months to19 December 2020.

2

The Project Results Framework should be updated.  

3

Compile a post-project sustainability action plan.

1. Recommendation:

Extend the project by an additional 12 months to19 December 2020.

Management Response: [Added: 2019/12/18] [Last Updated: 2019/12/18]

Official letter of request (and support documents) from IP to be received and considered

Key Actions:

Key Action Responsible DueDate Status Comments Documents
CO to engage HQ via PIMS+ internal system, and receive clearance from RR
[Added: 2019/12/18] [Last Updated: 2020/12/30]
CO , HQ 2021/03 Initiated The country office has initiated the process, clearance was also received from RR. The package was sent to the regional technical advisor. History
Receive request letter from IP as well as the proposed work-plan of the extension period
[Added: 2019/12/18] [Last Updated: 2020/12/30]
Project Manager 2020/12 Completed The request letter and the proposed work-plan were received from the Department of Mineral Resources and Energy on 26 November 2020. History
CO to check budget (esp. PCU budget) and sensitivity to project cost over-run potential.
[Added: 2019/12/18] [Last Updated: 2020/12/30]
Country Office 2020/12 Completed The budget was verified by the financial associate and the programme head to ensure that the budget is within the 5 per cent threshold. History
Communicate response to extension request, under the remit of recently issued extension policy and POPP
[Added: 2019/12/18] [Last Updated: 2021/01/05]
Project Manager, CO, HQ 2020/12 Completed The guidance was received from the Regional Service Centre that UNDP cannot approve a second extension for another 12 months, maximum allowable in this case because of COVID-19, the extension can only be 6 months (unless a new policy comes into place). Therefore, the IP has been requested to start preparing documentation for the 6-month extension request. History
2. Recommendation:

The Project Results Framework should be updated.  

Management Response: [Added: 2019/12/19]

Fully agreed. The task can be readily undertaken by Project Manager, and agreement to do so has already been achieved.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
Refine targets and indicators within the remit of the Prodoc for endorsement of the PSC
[Added: 2019/12/19] [Last Updated: 2020/12/22]
IP 2020/01 Completed The Results Framework should be updated to reflect recommendations outlined in MTR report. The Project Board should be part of the updating process. The feasibility of an additional project extension (6 months, from 01 January 2021 – 30 June 2021) is to be explored, which the IP should initiate. History
3. Recommendation:

Compile a post-project sustainability action plan.

Management Response: [Added: 2019/12/19]

Fully Agreed (depends on whether or not the extension is granted, and the terms thereof)

Key Actions:

Key Action Responsible DueDate Status Comments Documents
The Action Plan will be prepared with a focus on (a) Post-WASA continuation on wind measurements, ownership of wind masts, and continued use for climate forecasting; (b) Capacity building needs (e.g. SARETEC or expansion of wind courses to other educational institutions), depending on future demand for skilled workforce; (c) Analysis of market development of large grid-connected wind power in view of the new IRP 2019 and REIPPPP resumption; and (d) Market assessments Incl. institutional arrangements needed) and financial-economic analysis of small-scale wind energy, including power generation in the 100 kW- 2 MW range, and wind-powered water pumping.
[Added: 2019/12/19] [Last Updated: 2020/12/22]
PMU, PSC, UNDP 2021/03 Initiated Various discussions on sustainability with the partners are already in advanced motion, namely with the WASA consortium; and with SARATEC. TOR for the said specialized market studies have been developed. These are important building blocks for the preparation of the Sustainability Action Plan. History