BRA 07/G32 Brazilian Mangroves Effective Conservation and Sustainable Use of Mangrove Ecosystems in Brazil
Commissioning Unit: Brazil
Evaluation Plan: 2012-2016
Evaluation Type: Project
Completion Date: 11/2018
Unit Responsible for providing Management Response: Brazil
Documents Related to overall Management Response:
 
1. Recommendation: 1.1. Conclude and implement the Action Plan for the Conservation of Endangered Species and the Socioeconomic Importance of the Mangrove Ecosystem for the Brazilian Coast (PAN Manguezal), in the areas: ? Southern and South-eastern Region; ? North-eastern Region and the state of Espírito Santo; and ? Northern coastal region.
Management Response: [Added: 2014/09/15] [Last Updated: 2014/09/15]

PAN Manguezais is key for directing financing and for the conservation of mangroves; it adopts an innovative focus with an ecosystem-based social vision and sustainable use. The methodology for the elaboration of PAN Manguezal establishes the division of actions into three regions: ? Southern and South-eastern Region; ? North-eastern Region and the state of Espírito Santo; and ? Northern coastal region. The perspective is that the planning will be finalised for the three regions, after which the project will begin the implementation phase. The project will define a Pilot Area that is strategic for the implementation of PAN.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
1- Finalize the establishment of the PAN in the areas that are lacking. It will be finalized in agreement with the plan for monitoring biodiversity and the plans for management of UCs with mangroves. 2- Support implementation (implementation, dissemination) 3- Systematize information: good practices and lessons learned to insert into public policies. 4- Define and implement a replication strategy: defined guidelines, ordinances, and publications.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio DISAT/DBIO Consultants 2015/12 Completed History
2. Recommendation: 1.2. Define financial strategies for the conservation and sustainable use of the mangrove ecosystems through strengthening institutional partnerships.
Management Response: [Added: 2014/09/15] [Last Updated: 2014/09/15]

In order to define mechanisms that guarantee financial sustainability, it is necessary, in the first place, to evaluate those that have already been implemented in other areas, identify new ones, and evaluate what the costs of implementation of these mechanisms would be. With these data it will be possible to create a more accurate implementation plan, in this way testing the mechanisms that will be defined as those that are most viable. On the other hand, the project will identify the existing synergies with the GEF Mar project, still to be approved, to be able to carry out the work in an integrated and complimentary manner. This is forecast to begin immediately.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
1- Map out the current instruments 2- Evaluate costs. 3- Coordinate with GEF Mar in order to find synergies and opportunities. 4- Define an action strategy to evaluate the possibility of implementing in a pilot area. 5- Support the test implementation in a pilot area. 6- Systematize information: good practices and lessons learned to insert into public policies. 7- Define and implement a replication strategy: defined guidelines, ordinances, and publications.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
ICMBio (Coordination), Consultants 2015/12 Completed History
3. Recommendation: 1.3. Improve legal and regulatory framework with regards to conservation and sustainable use of mangroves on federal, state and local levels.
Management Response: [Added: 2014/09/15]

Clear articulation in order that the SISNAMA precepts and their application in states and municipalities will be carried out. Because the diagnostic that was carried out identified gaps in responsibilities and overlaps in skills among federal, state, and local levels

Key Actions:

Key Action Responsible DueDate Status Comments Documents
1- Based on the diagnostic initially undertaken. Carry out sectorial meetings for adjustments to be made in the legal regulatory framework. 2- Identification of good practices generated over the course of the project that can contribute to improvement of the regulatory framework. For this periodical internal evaluations are necessary.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
ICMBIO 2015/12 Completed History
4. Recommendation: 1.4 Establish mechanisms and participatory procedures in order to strengthen the Management Councils of UCs.
Management Response: [Added: 2014/09/15]

The project is already strengthening and fostering participation of Management Councils, while members of these Management Councils are part of the CTAPs of the Pilot areas.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
1: Make thematic calendars for the Management Council meetings effective for definition of tools for participation, such as, for example, WGs. 2- Promote information exchange among UC Management Councils of the project and other units with Mangroves.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
ICMBIO Pilot areas. 2015/12 Completed History
5. Recommendation: 1.5. Promote participatory discussions on the Management Plans of the APA and of Barra do Rio Mamanguape and ARIE of Foz do Rio Mamanguape in order to formulate a plan for monitoring and control of the PAN and the interaction between this and the management plans.
Management Response: [Added: 2014/09/15]

This action isn?t initially forecast as one of the project?s products. However, we consider the integrated implementation of different forecasted products important in the logical framework to thus test as well the functioning of different good practices generated by the project in an integrated manner.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
1.5.1. Finalize the management plan for APA and ARIE which is currently being written and will integrate with the plan for monitoring which should be integrated with PAN Manguezal, Plan for Monitoring Biodiversity and vegetal covering. 1.5.2 Implement the management plan to test the zoning proposal and the implementation proposal. 1.5.3. Evaluate and systematize information generated by the implementation of the management plan for the identification of good practices and lessons learned.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio DIMAM CSR/IBAMA 2015/12 Completed History
6. Recommendation: 1.6. Elaborate and implement the National Mangroves Program.
Management Response: [Added: 2014/09/15]

Product forecast in the logical framework of the Project. This National Plan for Use and Conservation is a consolidation and systematization of good practices and lessons learned extracted from all the project?s actions. Both the Director?s committee and the Coordination of the Project are fundamental in order to establish and strengthen partnerships and articulate for the integration of results of the project to be inserted into public policies.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
1.6.1.Establish and define the Program?s structure. 1.6.2. Define the necessary institutional arrangements. 1.6.3. Edit, publish and disseminate the document. 1.6.4. Create work agenda together with the Technical Commission of Mangroves. 1.6.5.Incorporate Director?s Committee and the Technical Commission for Implementation and monitoring, promoting joint meetings.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio; Technical Commission; Director?s Committee 2015/12 Completed History
7. Recommendation: 2.1. Conclude Plan for Integrated Management of Research Resources with focus on ecosystem for the 9 (nine) RESEX (extractivist reserve) marines.
Management Response: [Added: 2014/09/15]

We consider it important that the implementation of an integrated management is articulated with institutional actions in states and the specific mechanisms for management is adopted within ICMBio. This articulation makes it possible to establish accords with OEMAS and local environmental organs, since integrated strategies of management are constructed. In the next stages of the Project?s execution, when the National Mangroves Program is elaborated and in implementation, make agreements with states for their accomplishments, thus complying with the PRODOC indicators.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
2.1.1 The Plan has been finished, and is being analysed by ICMBio. 2.1.2 Implement plan. 2.1. Prioritise procedures for participative monitoring of mangrove resources 3 Evaluate implementation of plan.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/Iambi Pilot Area/ State Government. 2015/11 Completed History
8. Recommendation: 2.2. Elaborate the Management Plan for Uçá crab.
Management Response: [Added: 2014/09/15] [Last Updated: 2014/09/15]

In order to create the crab management plan, it is necessary, first, to carry out a bid process in order to contract a firm that will design the plan with the Coordination for the Pilot Area. The Term of Reference that defines the actions to be carried out is being finalised, following which the bidding process process for contraction of services will begin. Still in this 6-month phase, the creation of the plan will begin. This allows posterior implementation the plan following the lessons learned and good practices extracted from the implementation of the integrated management plan for fishing.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
2.1.1 Creation of the Plan 2.1.2 Implement the plan. 2.1.3 Evaluate the implementation of the plan
[Added: 2014/09/15] [Last Updated: 2018/10/03]
ICMBio (Coordination), Pilot Area Parnaíba Delta, Consultants. 2015/12 Completed History
9. Recommendation: 2.3. Carry out study for a diagnostic of business opportunities for products related to mangrove biodiversity.
Management Response: [Added: 2014/09/15]

A consultant will be contracted to create a study/diagnostic on potentials for alternative means to generate income through the use of products and services of socio-biodiversity. As soon as it is finalized, it will offer a clearer panorama of the principal actions that can be implemented and their viability.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
2.3.1 Detailed study in the Parnaíba Delta identifying potentials for income generation using biodiversity within PAN Manguezais. 2.3.2 Select the products/services of the mangrove considered most viable, to implement in a pilot area. 2.3.3 evaluate and systematize
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio/DISAT + DIBIO + CTL + ICMBio AP1-5, consultants 2015/12 Completed History
10. Recommendation: 3.1. Elaborate Ecological-Economic zoning of Reentrâncias Maranhenses Pilot Area.
Management Response: [Added: 2014/09/15]

Taking into consideration the results from the workshops in 2012 (May) and 2013 (April), it was concluded that the results indicate low performance of the planned activities for this pilot area. In the coming months, an evaluation to define another pilot area that offers better facility to elaborate zoning will be undertaken.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
Evaluate if this action is viable for this pilot area; if it is not, eliminate pilot area from project.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBIO 2015/12 Completed History
11. Recommendation: 3.2. Strengthen ties between water resources and the CTAPs/UCs.
Management Response: [Added: 2014/09/15]

As mentioned in item 2.4, it?s important to identify and foster alternative spaces and information receptors as well as decisions made for the mangroves. Considering the existence of financial resources already available for the activity of reconciliation between management instruments for space and water management and the mobilization of state, regional, and local partners, it?s important to have financial technical performance around these issues.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
Plan of information and dissemination for all actors, including Basin committees, on the importance of water resources in the sustainable use and conservation of mangroves.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBIO 2015/12 Completed History
12. Recommendation: 3.3. Establish inter-institutional articulations, reducing risks that are derived from political factors as well as emergencies that could make unviable other investments in contribution towards the conservation and sustainable use of the mangrove ecosystem, such as the Mamanguape Management Plan for Water Resources.
Management Response: [Added: 2014/09/15]

The actions will be better defined in the meeting agendas of the Committee director and the Technical Commission, in that some processes are conducted, such as the PAN, Biodiversity and vegetal covering monitoring, where risks and threats will become evident

Key Actions:

Key Action Responsible DueDate Status Comments Documents
3.3.1. Carry out study on the pressures on the mangrove ecosystem for discussion with the team and the Committee director, with the objective of resolving issues on institutional responsibilities. 3.3.2. Encourage reflections and decisions about mangroves in the purview of the Committee director of the project, so that sectorial policies are better integrated. 3.3.3. Adjustments will be made for the improved identification of external impacts on the UCs with mangroves and the definition of strategies for mitigation.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio Committee Director 2015/12 Completed History
13. Recommendation: 4.1. Increase and intensify the participation of different sectors of ICMBio in the thematic discussions about mangroves
Management Response: [Added: 2014/09/15]

Discussions have already started, the project is being implemented by different ICMBio directorates/centres, a Technical Commission for the project has been created, made up of representatives of different ICMBio directorates, representatives of the university and other ministries. It would be relevant to establish a calendar of periodical meetings

Key Actions:

Key Action Responsible DueDate Status Comments Documents
4.2.1. Conclude and examine the Program for Monitoring Mangrove Biodiversity. 4.2.2. Implement the plan for biodiversity monitoring.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio +DIBIO 2015/12 Completed History
14. Recommendation: 4.2. Conclude and examine proposal of biodiversity management for the Federal UCs that have mangroves and provide technical support to the implementation phase of the program.
Management Response: [Added: 2014/09/15]

Large portions of UCs with mangroves belong to states of the federation. As such, the protocols and methodology used on the federal level need to incorporate initiatives and interact with regional networks.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
4.2.1. Conclude and examine the Program for Monitoring Mangrove Biodiversity. 4.2.2. Implement the plan for biodiversity monitoring.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio +DIBIO 2015/12 Completed History
15. Recommendation: 4.3. Establish and implement permanent systems of Monitoring and Evaluation for learning and control, using IT tools in an efficient, transparent, and amicable manner
Management Response: [Added: 2014/09/15]

A plan of monitoring of the project will be created that pulls together different tools that facilitate the communication, collection, and presentation of information about the project?s performance.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
4.3.1. Conclude the creation of Monitoring and Evaluation Plan for the Project activities in a decentralized manner. 4.3.2. Implement M&E Plan
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio 2015/12 Completed History
16. Recommendation: 4.4. Implement participatory monitoring procedures of mangrove resources (fish in the Salgado Paraense and crabs in the Delta).
Management Response: [Added: 2014/09/15]

The methodology for participatory monitoring will be defined soon, jointly with communities, following examples that have already been implemented in Brazil.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
During the implementation of resource management plans (fish and crabs) guarantee the implementation of participatory monitoring.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio 2015/12 Completed History
17. Recommendation: 4.5. Establish new management forms with a modern and participatory approach, such as co-management and comprehensive territories, complemented by communities of practice and learning that offer solutions to complex problems of articulation among government entities and levels. The adoption of management procedures by results is also recommended.
Management Response: [Added: 2014/09/15]

See items 4.1 e 4.1.2

Key Actions:

Key Action Responsible DueDate Status Comments Documents
4.5.1. Promote discussions about issues such as management, co-management, and comprehensive territories, as well as other matters pertaining to these subject.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CNICMBIO 2015/12 Completed History
18. Recommendation: 4.6. Establish instruments for monitoring and inspection of mangroves that promote higher levels of attention to the monitoring of cover on reduction of risks for introducing large enterprises.
Management Response: [Added: 2014/09/15]

See items 4.1 e 4.1.2 This will be incorporated in the next steps for the integrated plan for fishing, PAN, monitoring biodiversity, management plans, and vegetal covering.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
4.7.1. Improve articulation of actions in progress: PAN, Program for Biodiversity Monitoring, mapping the vegetal covering and management plans.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio DIBIO CSR/IBAMA/ DIMAM 2015/12 Completed History
19. Recommendation: 4.7. Use digital geospatial tools to facilitate territory management, whether it is to facilitate conflict management or looking at the different types of use for soil and natural resources.
Management Response: [Added: 2014/09/15]

ICMBio is strengthening and expanding partnerships for this area, incorporating better integration among various other projects within the institution, so that management and production of information can be better utilised It?s important to articulate and incorporate activities that are part of the day-to-day for other specialized institutions in the area, for a better spatial management of mangroves, as well as access to and production of information.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
Promote articulation with institutions rendering services on spatial information for definition of appropriate technologies and methodologies to be utilised.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio CSR/IBAMA 2015/12 Completed History
20. Recommendation: 4.8. Strengthen political, technical, and bureaucratic cooperation to streamline decisions that have interfaces and interfere directly with the action of ICMBio jointly with the UCs, but that are prerogatives in other instances.
Management Response: [Added: 2014/09/15]

The concurrent strengthening of diverse sectors is relevant for raising awareness on the importance of mangroves. Perhaps knowledge of the agenda of other ministries and institutions could identify already existing actions or show the need for the creation of new initiatives aiming to reduce possible risks to the ecosystem. This articulation would contribute with the better use of financial and human resources for the Mangrove Project in Brazil.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
See actions of item 3.3.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio 2015/12 Completed History
21. Recommendation: 4.9. Consolidate and disseminate studies and research material, as well as teaching material, produced as a result of Project activities.
Management Response: [Added: 2014/09/15]

Materials will be produced and disseminated as they are concluded. Considering that some authors have already made material available, gaining access to this information and its contents on society?s part is important and brings increased knowledge about the mangrove ecosystem and demonstrates the Project?s relevance.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
Implement program for capacity building, training, communication, and dissemination of lessons learned with the permanent production of materials. See item 4.1
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio CTL/ICMBio PA1 2015/12 Completed History
22. Recommendation: 4.10 Strengthen the executing agency with the incorporation of qualified and dedicated full time personnel for the Project, for more institutional involvement, which results in continuity and institutionalization of the actions.
Management Response: [Added: 2014/09/15]

It is considered important to have an acquisitions plan, both for materials and for human resources, in order to improve Project performance given the characteristics of the framework of institution personnel. This is oriented so that the plan is linked to expected results for the Project.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
4.10.1 Proceed with the contracting of full time personnel per project result. 4.10.2 (obtain definition about the possibility of contracting qualified full time personnel for each result of the project in order to guarantee the continuity of actions up until the finalisation of the project.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio PNUD 2015/12 Completed History
23. Recommendation: 4.12. Establish more efficient administrative and financial mechanisms in order to obtain higher technical and financial operational performance, with transparency, consolidation, and communication of information and results
Management Response: [Added: 2014/09/15]

Administrative-financial tools from GEF are determined to be utilized for the Mangrove Project in Brazil. These already-consolidated instruments are for registration and monitoring, reducing risks of impact in financial sustainability and continuity of the project. For example, it?s possible to fill out information in real time on the chronological execution of activities, as well as counterpart investments through filling out the POA/GEF spreadsheets.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
4.12.1. Creation and adoption of operations manual for existing practices and procedures for the performance of the Mangroves Projects and others. 4.12.2. Consolidate, approve, and support in the implementation of the proposal.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio 2015/12 Completed History
24. Recommendation: 4.13. Promote effective articulations among institutional structures and Project activities
Management Response: [Added: 2014/09/15]

Utilize the space of the ICMBio thematic group, already suggested.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
Carry out discussions about political and administrative issues and decide on articulation activities, within the scope of the ICMBio Thematic Group.
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio 2015/12 Completed History
25. Recommendation: 4.14. Create Plan for Communication and Mobilization of the community, seeking to obtain effective participation and transparency about issues that take place or will take place
Management Response: [Added: 2014/09/15]

Utilize the space of the ICMBio thematic group, already suggested.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
4.14.1. Involve ICMBio representative at the local level in discussions about this Plan within the Thematic Group. 4.14.2. Implement the plan and publicise its results to involved actors. 4.14.3. Contract specialised personnel to create and support the implementation of the communication plan (internal and external)
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio 2012/01 Completed History
26. Recommendation: 5.1. Final evaluation and METT
Management Response: [Added: 2014/09/15]

It is important to remain attentive to the organization and documentation of the information generated by the Project, since they are inputs for the evaluations and future audits.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
5.1.2. Define strategy for the final application of the Management Effectiveness Tracking Tool (METT). 5.1.1. Consolidate information generated by the project through systematizing the METT results in the three periods. 5.1.3. Prepare the defined timeline for the final evaluation and those responsible for the activities
[Added: 2014/09/15] [Last Updated: 2018/10/03]
CN/ICMBio PNUD/GEF 2015/12 Completed History