Commissioning Unit: | India |
---|---|
Evaluation Plan: | 2013-2017 |
Evaluation Type: | Project |
Completion Date: | 12/2017 |
Unit Responsible for providing Management Response: | India
|
Documents Related to overall Management Response: |
|
Key Action Update History
Even at this late stage, an Exit Strategy should be prepared which outlines specific step-by-step actions required to ensure the project-initiated activity is sustained and if possible replicated and scaled up. A presentation of the exit strategy should be made to the key entities that need to follow up on matters. This presentation should be made before project closure
Management Response: [Added: 2017/12/21] [Last Updated: 2017/12/21]
Noted and a presentation would be made
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
A presentation on exit strategy to be made
[Added: 2017/12/21] [Last Updated: 2018/05/22] |
UNDP & PMU | 2018/05 | Completed | History |
The draft Malvan Marine Sanctuary management plan should be prepared (an early first draft was available at the time of the TE) without further delay incorporating the technical data based on the studies undertaken during the project. This draft plan should then be shared jointly by the Forest Department and the District Administration with stakeholders for gaining their inputs
Management Response: [Added: 2017/12/21]
The draft plan is under review which will be shared with stakeholders soon
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
Discuss and finalize the 'draft' plan to share with the stakeholders
[Added: 2017/12/21] [Last Updated: 2018/07/17] |
UNDP & PMU | 2018/05 | Completed | History |
Scale-up solid waste management efforts which in part through project support have become highly successful but require scaling up to maximum impact
Management Response: [Added: 2017/12/21]
Eventhough the project is over, it will be discussed further to scale-up at the appropriate level
Key Actions: