Mid-Term Review for the Project Mainstreaming Green Environmental Development
Commissioning Unit:Bosnia and Hercegovina
Evaluation Plan:2015-2019
Evaluation Type: Project
Completion Date:11/2017
Unit Responsible for providing Management Response: Bosnia and Hercegovina
1. Recommendation:

Universal acceptance: Project should aim to achieve universal acceptance of EIMS as a tool for fostering energy efficiency in public buildings across both entities and all cantons, as well as on the state level

Management Response: [Added: 2017/11/20] [Last Updated: 2017/12/07]

The reccmmendation is vald and accepted.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
1.1. Institutionalization of energy monitoring and reporting (EMIS) a. Incorporating EMIS into rulebooks for energy monitoring and reporting on entity level b. Further strengthening of entity funds for using EMIS as main tool for energy reporting and monitoring of savings in Public sector c. Introduction and acceptance of EMIS on state level government (MoFTER)
[Added: 2017/11/20] [Last Updated: 2018/09/20]
Energy and Environment Sector and Green Economic Development Project 2020/12 Initiated Both entity funds accepted EMIS as main tool for energy monitoring. Signed MoU with MOFTER for institutionalization of energy management. 20.09. 2018 Environmental funds of two entities continued using EMIS for energy consumption monitoring of public buildings registered so far.
2. Recommendation:

Extending coverage: In line with universal acceptance, Project should aim to spread retrofit project across all entities and cantons.

Management Response: [Added: 2017/11/20] [Last Updated: 2017/12/07]

The recommendation is valid and accepted.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
2.1. Fundraising and expanding project activities throughout the country a. The sector and the project prepared and submitted new funding proposal for project extension and scaling up with intention to add minimum 54 new public buildings for retrofit. b. Project aim is to strengthen current and establish new partnerships with key local stakeholders (new cantons, municipalities, cities, institutions…) c. New activities will be added (renewable energy sources to remote areas off-grid, renewable energy sources installations into public sector buildings and public lighting)
[Added: 2017/11/20] [Last Updated: 2018/09/20]
Energy Environment Sector and Green Economic Development Project 2020/12 Initiated Project proposal submitted to SIDA. 20.09.2018: SIDA approved new phase of the project with additional funding in the value of 4 MEuro for the period of three years.
3. Recommendation:

Enlarging scope of retrofit projects: In line with the EU EPBD directive which requires that every new public building from the year 2018 has to be of Net Zero Energy Building Standard (NZEB), retrofit project should include appropriate RES measures and integrate them with EE measure aiming at achieve nearly NZEB standard.

Management Response: [Added: 2017/11/20] [Last Updated: 2017/12/07]

The recommendation is valid and accepted.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
3.1 Implement additional energy efficiency measures in public sector buildings a. The project aims to perform “deep retrofit” in public sector buildings by installation of energy efficiency/ renewable energy source equipment and therefore promote country’s move towards NZEBS (net zero energy building standard) b. Develop Policy for Nearly Zero Energy Building Standard
[Added: 2017/11/20] [Last Updated: 2018/09/20]
Energy Environment Sector and Green Economic Development Project 2020/12 Initiated Project proposal submitted to SIDA. Project plans to implement this activity at minimum 18 public buildings. 20.09.2018: Project identified public buildings to be retrofitted starting in 2018. Final figure is still to be defined, depending on the interests of local communities.
4. Recommendation:

Upgrading EMIS: EMIS platform is already of a mature age and requires face lifting both in terms of user-friendliness and functionality. The graphical user interface has to be upgrade in line with current similar products standards (GIS aspects, google map, satellite images of cites and buildings, interactive dashboard, etc.). In terms of functionally, an building energy intensity mapping feature should be added. Once all public buildings are entered in the data base, this feature will allow immediate colour coded insight into energy efficiency of individual buildings. Another additional function should be for monitoring, verification and reporting of savings achieved in support for performance based granting and ESCO business model.

Management Response: [Added: 2017/11/20] [Last Updated: 2017/12/07]

The recommendation is valid and accepted.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
4.1 In line with MTR, project integrated into new project proposal the development of Energy intensity mapping application
[Added: 2017/11/20] [Last Updated: 2018/09/20]
Energy Environment Sector and Green Economic Development Project 2019/12 Initiated Project proposal submitted to SIDA. 20.09.2018: The new project phase II includes activity development of Energy intensity mapping application.
5. Recommendation:

Adding street lightning: Street lighting efficiency improvement is very important for municipalities because public lighting accounts for significant part of municipal budgets, but also because efficient lighting is critical for creating safe and comfortable public space and living environment for the citizens. Therefore street light module should be added to EMIS.

Management Response: [Added: 2017/11/20] [Last Updated: 2017/12/07]

The recommendation is valid and accepted.

Key Actions:

Key Action Responsible DueDate Status Comments Documents
5.1 The sector and the project prepared and submitted new funding proposal for project extension and scaling up with intention to add minimum 54 new public buildings/ infrastructure for retrofit, out of which 6 are intended for public lighting.
[Added: 2017/11/20] [Last Updated: 2018/09/20]
Energy Environment Sector and Green Economic Development Project 2020/12 Initiated Project proposal submitted to SIDA. 20.09.2018: The project phase II includes a separate activity related to energy efficient public lightning. Currently, the locations are being identified.
6. Recommendation:

Supporting Energy performance certificates (EPC): EPC are gaining acceptance and certification process is going to expand. In order to provide support for relevant Ministries for monitoring the process and assuring quality of accredited certification work, EMIS should be extended with a module which supports related co-locations for preparation EPC in an objective, transparent and comparable manner.

Management Response: [Added: 2017/11/20] [Last Updated: 2017/12/07]

The recommendation is valid and accepted. 

Key Actions:

Key Action Responsible DueDate Status Comments Documents
6.1 Development of Measurement and verification (M&V) module within EMIS Supporting Energy Performance Certificates
[Added: 2017/11/20] [Last Updated: 2018/09/20]
Energy Environment Sector and Green Economic Development Project 2020/12 Initiated Project proposal submitted to SIDA. 20.09.2018: The project team is developing ToR for EMIS maintenance company to assess the current possibilities and eventual cost implications.
7. Recommendation:

Contributing to SDGs: develop and implement monitoring framework to regularly monitor and assess SDG-related benefits of the project interventions, at the level of individual investment sub-projects and broadly for the whole project.

Management Response: [Added: 2017/11/20] [Last Updated: 2017/12/07]

The recommendation is valid and accepted. 

Key Actions:

Key Action Responsible DueDate Status Comments Documents
7.1 The project will work towards development and implementation of monitoring framework for regular monitoring and assessment of SDG-related benefits of the project interventions, at the level of individual investment sub-projects and broadly for the whole project.
[Added: 2017/11/20] [Last Updated: 2019/01/02]
Energy Environment Sector and Green Economic Development Project 2018/12 Completed 20.09.2018: The project actions related to SDGs monitoring and promotion fits in to the CO overall efforts related to SDGs.
8. Recommendation:

Mainstreaming Gender: Gender analysis: to understand the specific aspects of gender inequality, if exist, in the context of buildings energy (in)efficiency is concerned, and the social, economic and political factors underlying such inequalities, as well as the potential contributions of women and men to societal changes required to promote investment in energy efficiency;
• Gendered actions: identify and incorporate in the project design specific methods and tools to promote greater gender equality and reduce gender disparities in GED project activities.
• Gender-sensitive M&E: propose and measure the outcomes and impacts of project activities on women and men’s through gender- responsive M&E. It is suggested that all Project Components of the GED project to include at least one gender-related indicator, as elaborated in Table .

Management Response: [Added: 2017/11/20] [Last Updated: 2017/12/07]

The recommendation is valid and accepted. 

Key Actions:

Key Action Responsible DueDate Status Comments Documents
8.1 Development of “Study on human development benefits and gender mainstreaming”
[Added: 2017/11/20] [Last Updated: 2018/08/10]
Energy and Environment Sector and Green Economic Development Project 2018/05 Completed Under development. Findings of the Study will contribute to better understanding of GED project impact, both on human development and gender mainstreaming, which will be further taken into account in next projects.
9. Recommendation:

Strenghten Communications: Integrate in the scope of communication strategy and plan impact monitoring, in terms of improved awareness and behavioural changes among various targeted categories. In particular, the focus on monitoring changes in awareness and motivation among investment decision-makers could be additionally assessed and monitored
• Put more emphasis on communicating sustainable development impacts of EE investment (i.e. those which go beyond budgetary and energy saving), in particular such aspects as improved comfort and occupancy conditions for building users, health and education impacts of such investment, as well as gender dimension (see also recommendations from the gender section)
• Prepare and make publicly available information about investment projects in the form of simple fact sheets containing key information about achieved results, as well as visual (like “before and after” pictures)
• Every retrofit project upon completion should be described in simple fact sheet as a particular case study.

Management Response: [Added: 2017/11/20] [Last Updated: 2017/12/07]

The recomenadtion is valid and accepted. 

Key Actions:

Key Action Responsible DueDate Status Comments Documents
9.1 Upgrade and further develop communication strategy
[Added: 2017/11/20] [Last Updated: 2018/09/20]
Energy and Environment Sector and Green Economic 2020/12 Initiated Projects communication strategy developed in 2017. Needs upgrading and further development. The Project developed new ToR for 2018 Media Campaign better responding to the donor expectations and targeting wider beneficiary groups such as end users of public buildings, ministerial officials, etc.
10. Recommendation:

Donor’s visibility: Project should take care that on all project documents – intermediary and final – donor visibility requirements are properly observed. Also, it is important to make sure that all sub-contractors are duly informed about project’s visibility requirements and relevant provisions are incorporated in the TORs and sub-contracts. Nominate dedicated GED project staff member to regular monitor compliance of sub-contractors with such requirements.

Management Response: [Added: 2017/11/20] [Last Updated: 2017/12/07]

The recommendation is valid and accepted. 

Key Actions:

Key Action Responsible DueDate Status Comments Documents
10.1 Within communication strategy, integrate donor’s visibility
[Added: 2017/11/20] [Last Updated: 2019/01/02]
Energy and Environment Sector and Green Economic Development Project 2018/12 Completed 20.09.2018. The Project increased efforts to increase donor visibility throughout the whole year within the new media campaign but also joint events with the Donor and main project partners.