Commissioning Unit: | Chile |
---|---|
Evaluation Plan: | 2019-2022 |
Evaluation Type: | Project |
Completion Date: | 01/2021 |
Unit Responsible for providing Management Response: | Chile
|
Documents Related to overall Management Response: |
Key Action Update History
Design. To define indicators in the project design, great care must be taken so that they are compliant and measurable. One way to minimize this problem is by conducting extensive consultations with expert institutions on the identified issues during project development.
Management Response: [Added: 2021/06/24]
For the definition of indicators, the pertinent institutions will be consulted, and updated baseline information will be used.
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
1.1. Baseline information review
[Added: 2021/06/24] [Last Updated: 2021/07/04] |
UNDP/ IP and PMU | 2022/12 | Initiated | History | |
1.2 Key stakeholder interviews
[Added: 2021/07/04] |
UNDP/ IP and PMU | 2022/12 | Initiated | ||
1.3 Workshops for indicator adjustments
[Added: 2021/07/04] |
UNDP/ IP and PMU | 2022/12 | Initiated |
Design. The design of projects must pay close attention to the extent to which the territorial assets of the central subjects with whom they work are relevant and sufficient. This is so that the interventions can generate a staggered aggregation of benefits that supports progress towards the objective and towards obtaining global environmental benefits
Management Response: [Added: 2021/06/24]
The selection of the beneficiaries and territories of the projects will be carried out considering a baseline, governance, and public-private partnerships.
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
2.1. Baseline information review
[Added: 2021/06/24] [Last Updated: 2021/07/04] |
UNDP/ IP and PMU | 2022/12 | Initiated | History | |
2.2. Multi-criteria analysis for selection of territories
[Added: 2021/07/04] |
PNU/UNDP/IP | 2022/12 | Initiated |
3. Execution. Projects working at various spatial levels must develop criteria and methodologies that allow them to identify the way in which the conservation object(s) are expressed at different scales, in order to identify them and incorporate them into the interventions and to be able to generate global benefits in a staggered manner, from the most local territorial levels, towards the most aggregated levels
Management Response: [Added: 2021/06/25]
Integrated territorial analyzes will be carried out, considering the different scales and the contributions from the local to the global. For this, the aggregate contributions of the territories will be verified for the fulfillment of the project objectives.
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
3.1 M&E of the indicators identified in the project
[Added: 2021/07/04] |
PMU/UNDP | 2022/12 | Initiated | ||
3.2 Integrated analysis of project results and their impact at the local and global level
[Added: 2021/07/04] |
PMU/UNDP | 2022/12 | Initiated | ||
3.3 Sustainability of results and dissemination of lessons learned and good practices
[Added: 2021/07/04] |
IP/UNDP | 2022/12 | Initiated | At the final stage of project implementation and after project closure History |
4. Reverse migration processes (city - countryside) should be seriously considered in the design of projects aimed at rural and peasant areas, in order to incorporate new visions and types of roles among local beneficiaries
Management Response: [Added: 2021/07/04]
Reverse migration will be considered in rural projects that are implemented in areas, as a contribution to strengthening capacities and strategic alliances.
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
4.1 Capacity analysis and stakeholder map
[Added: 2021/07/04] |
Project Management Unit | 2022/12 | Initiated | ||
4.2 Knowledge management: systematization of good practices and experiences that can be applied in the implementation of the project
[Added: 2021/07/04] |
PMU | 2022/12 | Initiated |
5. Design. The new projects should include from their design the realization of studies that make a comparison between the beginning and end situation. In addition, they should provide an understanding of both the causes of the initial situation, as well as the changes introduced and the keys to such changes
Management Response: [Added: 2021/07/04]
The project design will consider a robust baseline analysis. And during its implementation, periodic monitoring will be carried out, which will allow to determine progress against the established goals.
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
5.1 Baseline determined
[Added: 2021/07/04] |
PMU/UNDP/IP | 2022/12 | Initiated | History | |
5.2 Periodic M&E system to establish achievement of goals
[Added: 2021/07/04] |
PMU/UNDP | 2022/12 | Initiated | History | |
5.3 Annual and final results report
[Added: 2021/07/04] |
PMU/UNDP | 2022/12 | Initiated | History |
6. Execution. Projects with a strong operational character and wide areas of intervention must have sufficient technical teams on site from the beginning of the project and with the necessary implementation capabilities. These must achieve the replicability and scalability of the intervention models developed.
Management Response: [Added: 2021/07/04]
During project design, a human resources analysis will be conducted to allow the implementation of actions, follow-up and systematize the lessons learned.
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
6.1 ToR design and selection of personnel with the appropriate profile
[Added: 2021/07/04] |
PMU | 2022/12 | Initiated | ||
6.2 Capacity building of project teams
[Added: 2021/07/04] |
PMU/UNDP | 2022/12 | Initiated | ||
6.3 System for exchanging experiences between project team and territories
[Added: 2021/07/04] |
PMU/UNDP | 2022/12 | Initiated |
7. M&E System. For complex projects such as CMS, it is recommended that an M&E person be assigned to design a system that not only defines procedures for monitoring outputs and activities, but also develops an M&E plan that defines a set of indicators and results that are specific to each level of the project and directly related to the overall project results.
Management Response: [Added: 2021/07/04]
For full size projects, the contract of a consultant for M&E will be considered
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
7.1 ToR design and selection of personnel with the appropriate profile
[Added: 2021/07/04] |
PMU/UNDP | 2022/12 | Initiated | ||
7.2 M&E system properly designed and implemented
[Added: 2021/07/04] |
PMU/UNDP | 2022/12 | Initiated |
8: Achievement of Results. The design of GEF projects should always include a community organization development component, so that they contribute to strengthening these organizations in their technical and management capacities.
Management Response: [Added: 2021/07/04]
The component for strengthening the capacities of local organizations and civil society will be included in the project design, as relevant taking into account needed resources.
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
8.1 Capacity development component considered as part of project design
[Added: 2021/07/04] |
UNDP/IP | 2022/12 | Initiated |
9. Achievement of Results. The Ministry of Environment must promote an articulation with the Ministries, services and municipalities involved in the different IETs to establish mechanisms that respond to the interest of different communities in order to continue advancing and support them in a process that leads to the “graduation” of these, to continue their route more autonomously. |
Management Response: [Added: 2021/07/04]
The Ministry of Environment will promote and maintain the alliances established during the implementation of the Project. The results achieved and the lessons learned will be used in other initiatives promoted by the Ministry. In addition, the exchange of experience with other public services will be maintained.
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
9.1 Meetings to exchange experiences and lessons learned
[Added: 2021/07/04] [Last Updated: 2022/01/26] |
Ministry of Environment | 2021/12 | Completed | Several meetings have been held at the initial workshops of new projects, where lessons have been shared with institutions and civil society organizations. History |
10. Differences and Similarities between CMS, FPA and SGP. The differential and aggregate impact on the issues of agency/ownership, community work and organizational development, which generate the longest duration of the projects; the higher financial amounts, the participation of users in the definition of the issues to be addressed in the projects; and the sustained and close technical support throughout the development of the project should be studied
Management Response: [Added: 2021/07/04]
Accepted.
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
During project design, attention will be given to similar initiatives to identify commonalities and potential synergies
[Added: 2021/07/04] |
UNDP | 2022/12 | Initiated |
11. Gender and indigenous peoples. It is suggested that any studies conducted be quickly transformed into concrete actions that address the needs of these groups.
Management Response: [Added: 2021/07/04]
The project did not include an integrated gender action plan or indigenous people plan, which is now compulsory for all GEF/UNDP projects.
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
11.1 Implementation of indigenous and gender actions identified in the action plans (indigenous people plan and gender action plan)
[Added: 2021/07/04] |
UNDP/PMU | 2022/12 | Initiated |
12. Gender and indigenous peoples. Early studies on the needs and potential of these groups are suggested to develop a strategy to effectively incorporate them into project activities.
Management Response: [Added: 2021/07/04]
Design and implementation of the action plan for indigenous peoples and gender in full size projects on the basis of early studies will be undertaken.
Key Actions:
Key Action | Responsible | DueDate | Status | Comments | Documents |
---|---|---|---|---|---|
12.1 Diagnostic of gender and indigenous peoples
[Added: 2021/07/04] |
UNDP | 2022/12 | Initiated | ||
12.1 Diagnostic of gender and indigenous peoples
[Added: 2021/07/04] |
UNDP | 2022/12 | Initiated | ||
12.2 Indicators and targets for gender and indigenous peoples incorporated in project design
[Added: 2021/07/04] |
UNDP | 2022/12 | Initiated |