Terminal Evaluation of Project Endosulfan
Commissioning Unit: China
Evaluation Plan: 2021-2025
Evaluation Type: Project
Completion Date: 12/2021
Unit Responsible for providing Management Response: China
Documents Related to overall Management Response:  
1. Recommendation:

The project’s scope included the tobacco sector. However, after the survey investigation, it was found that tobacco producers do not use endosulfan. This problem should be spotted before project design and implementation. The recommendation is a feasibility study or a pre-analysis of the sectors.

Management Response: [Added: 2022/01/11]

Fully Accept

Key Actions:

Key Action Responsible DueDate Status Comments Documents
UNDP will be mindful of the feasibility study and take possible actions to make it more relevant for new projects’ designing.
[Added: 2022/01/11]
PMU 2021/12 Completed
2. Recommendation:

This project has a positive impact on the environment but the impact on climate change mitigation and adaptation is unclear. Recommendations are to estimate GHG emissions reduction and adopt a strategy to mitigate the impact of climate change on the project sites.

Management Response: [Added: 2022/01/11]

Fully Accept

Key Actions:

Key Action Responsible DueDate Status Comments Documents
The strategy to mitigate the impact of climate change will be considered in the new project design and implementation.
[Added: 2022/01/11]
PMU and UNDP CO 2021/12 Completed
3. Recommendation:

The gender issue is important for the development of modern Chinese society. For this reason, the project should take this topic seriously. The recommendation is to find solutions to enhance gender equality and women’s empowerment within the project.

Management Response: [Added: 2022/01/11]

Fully Accept

Key Actions:

Key Action Responsible DueDate Status Comments Documents
In an effort to encourage more women, including both farmers and technical workers, to participate in the project’s training and related activities, under the project, gender mainstreaming training was held in late-2021, including 46 female agronomic and farmers.
[Added: 2022/01/11]
PMU and UNDP CO 2021/12 Completed
4. Recommendation:

4.1 The project should prepare a well-written lesson learned report. This important document will be useful for the PMU and for similar projects in the country and abroad.

4.2 The project should hold a workshop or prepare a document about a comprehensive exit strategy to ensure the long-time sustainability of results

Management Response: [Added: 2022/01/11]

Fully Accept

Key Actions:

Key Action Responsible DueDate Status Comments Documents
4.1 The lesson learned report will be prepared together with the project closure report.
[Added: 2022/01/11] [Last Updated: 2022/05/25]
PMU and UNDP CO 2022/05 Completed Completed as confirmed by programme colleagues. History
4.2 The project closure meeting was held on 30 Nov 2021.
[Added: 2022/01/11]
PMU and UNDP CO 2021/11 Completed